multi function 8 patterns high pressure garden hose spray nozzle mold (with video)
Why choose us?
Yunpeng Mold Factory focus on injection mold more than 15 years.(Click link to see us on youtube)
1. Quality is our soul!
2. Free 3 d Drawing service
3. 2 special after sales team to help you solve any problem.
4. We are ready to sign a contract with you in case you need to ensure our quality OR delivery date.
5. Time is gold for you and for us, so we have professional team work and production line.
6. Plastic Injection Mould OEM & ODM Services
7. ISO 9001, ISO 14001 Certified Factory
8. Attachment is our latest finished moulds.
Name
| Description
|
Mould material
| 45#, 50#, P20, H13, 718, 2738, NAK80, S136, SKD61 etc.(Hardness 35~55HRC)
|
Mould base
| Standard mould base, LKM, HASCO etc.
|
Cavity
| Single/multi
|
Runner
| Hot/cold |
Ejection system
| Motor/hydraulic cylinder/stripping plate/angle pin, etc
|
Cooling system
| In core baffle and in cavity plate chain drilling type cooling |
|
Design software
| UG, PROE, CAD, CAXA etc.
|
Plastic material
| ABS, GPPS, HIPS, AS, MS, PMMA, PC, PA6, PA66, PA+GF, PVC, PP, PE, TPE, TPU, TPR, LCP, PBT, PETG, PC/ABS, POM, PPS, PC, PPE, PPO, etc.
|
Surface treatment
| Polish, texture, sand blasting, chrome plating
|
Mould life
| 300,000-1,000,000 shots
|
Delivery time
| 15-45days
|
Pacakge
|
Standard export wooden case |
|
Specification
| As per customer's requirements |
Yuyao Yunpeng mould Is a rapid integration of industry and trade enterprises. We focus on injection moulds.
1. Factory area 8,000 square meters.
2. Production workers and sales 82 persons.
3. 2 after-sale service department
4.There are large and small injection mold machines, milling machines, grinding machines, CNC lathes, EDM machines, wire cutting machines, total 36 machines.
5. Providing one stop service from mould 3 d drawing design to plastic product production.
Products Packing workshop
one stop service from mould 3 d drawing design to plastic product production.
Production flow as below.
Yunpeng mold factory mold tooling packing and delivery:
Tooling Protecting oil>>Standard wooden box>>Plastic film
Mould tooling normally takes 35~40 days by sea. 3~7 days by air
Yunpeng mold factory plastic products packing and delivery:
Packing: Each packed in bubble bag or Polybag, then packed into master carton.
Normally by air: 3~7 days
FAQ About Plastic Injection Mould Tooling.
Q1: What kind of molds do you make? Plastic injection mold, Die casting mold or something else?
A1: Mainly plastic mold injection and Die casting mold.
Could allso make stamping molds according to our customer’s requirements.
Q2: What types of files do you accept (drawings)?
A2: STP, IGS, DXF, DWG, Cad Key PPT, STL, X_T, CATIA, UG files, etc.
Q3: What kind of steel do you use for plastic mouldings?
A3: P20, 718, 8407, NAK80, H13, S136, DIN 1.2738, DIN 1.2344, etc.
Q4: Can you provide the steel and heat-treatment certificate?
A4: Yes, no problem.
Q5: Can you make the texture / text / heat_treatment /nitriding for the inejction mold plastic?
A5: Yes, no problem.
Q6: How long is the lead-time for a plastic injection mold?
A6: It depends on the mold’s size and complexity. Normally 25~45 days.
Q7: Do you make spare parts for your customer?
A7: Yes, we will provide spare parts if needed.
Q8: How do you pack the china plastic moulds?
A8: Wooden box.
First : Daub rust preventive oil on the mold.
Second : We pack the mold with thin plastic film to avoid moisture.
Third : We put this plastic film packed mold in a wooden box, and fix it avoid any movement.
FAQ About Injection plastic products
Q9: How many injection plastic mouldings machines do you have?
A9: 40 sets till now.
Q10: What is the minimum & maximum unit weight and size your machines can produce?
A10: From 1 gram to 6000 grams weight.
Maximum size of unit plastic part: 1.5*1.5*1.5 meters.
Q11: What kind of plastic materials you usually use?
A11: PP, ABS,PC,POM,PA,HDPE,HIPE,PS,AS,PBT,PET,PMMA,PVC and so on.
FAQ About Worldwide Delivery
Q12: Can you deliver the plastic moulds or plastic products to our factory?
A12: Yes, We have cooperated with many international logistics companies for years.
And we have full experience to manage the delivery directly to the client's factory or appointed warehouse.